Pinnacle Point

Ready for trim and doors

We are now ready for cabinets, trim and doors on this project. Patterson Drywall has finished all of the drywall in the home and Gary and Travis have gotten everything painted. Dan Fox of Fox Flooring has finished all of the hard wood floors and are starting on some of the tile work. Friday we took delivery of all cabinetry from Wills Milling. Today we are going to receive some of the moldings and doors.

Master Bedroom
Top Level from Stairs
Bedroom
Garage

Pinnacle Point Update

The home on Pinnacle Point is framed up and ready for some exterior finishing. We will soon be putting soffits and siding on. The crew had this project under shingles within eight days. We will be Starting the plumbing and HVAC and getting ready for electrical work within the next couple of weeks.

Front Exterior
North Side
View from the lake

Two Days Framing

Topics: 

Well, here we are in day two of framing on Pinnacle Point. Second level deck and walls are in place, and roof trusses are getting started. This is one of the many great things about panelized construction. The speed of this process will allow our crews to have this project under shingles on Monday. Not too bad for four days of working.

Two Days Framing 1
Two Days Framing 2
Two Days Framing 3
Two Days Framing 4
Two Days Framing 5

Pinnacle Point Update

Topics: 

Today we took delivery of the home in Hillsboro, IL. This home is located in Pinnacle Point Subdivision on Glenn Shoals Lake. The delivery time was around 12:30 pm and construction was underway. Although we had an hour rain delay, construction took place immediately following. As you can see by the pictures, progress went well. The framing crew packed up for the night around 7:00 pm and had already gotten the 1st level deck floor and walls in place. Tomorrow we will be putting the 2nd story floor and walls up and hopefully a good start on the roof trusses. Not too bad for a day and a half.

Pinnacle Point Update
Pinnacle Point Update
Pinnacle Point Update

Pinnacle Point Foundation

Topics: 

This week at Baker Custom Homes & Buildings, Inc. we are under way with the foundation on the Pinnacle Point project. Today, Mitchell Concrete dug and poured footings for the basement walls. Tomorrow they will be forming up the basement walls and pouring them. This home features a walk out basement with a main level and an second story. Soon we will be setting the floor deck and building the walls. Check back soon for more information on this project and many more!

Pinnacle Point Foundation
Pinnacle Point Foundation
Pinnacle Point Foundation