Build Journal

1/2012 New foundation started in North Litchfield

Digging foundation
wakks startubg

2012 foundation/walls are started

1/2012 New foundation started in North Litchfield

This home is located in north Litchfield. Foundation started late January 2012

All the finishing touches!!!

This home in Hillsboro, Illinois is complete. This was a custom home design that featured an tremendous amount of detail work. All of the trim is Poplar with a Dark Mahogany finish supplied by Wills Milling of Carlinville, Illinois. All of the floor furnishings are supplied by Russel Furniture in Staunton, Illinois and installed by Fox Flooring in Staunton, Illinois. Concrete work was all done by Michel Concrete Company and Runkel Concrete both of Springfield, Illinois. Drywall and finishing done by Patterson Drywall from New Berlin, Illinois.

nice,craftsman style maint.free design
extra large dining area, overlooking the lake
Lakeside features 2 decks,a concrete porch and a huge concrete patio
stone, wood combination fireplace with stamped concrete hearth
oversised, craftsman style trims with 4 layer headers
Tons of glass, doors and wide open space

New 3 Car Garage in South Litchfield

This is our latest Wick Building project. It is a 24' x 36' x 9' Wick Building. The building is constructed on a concrete floating slap with a poured 6" x 6" rat wall. This project features 3 10' x 8' garage doors, supplied and installed by Mid West Garage Door Co. from Pawnee, Il. Gary and Travis just finished all of the electrical in the building last week.

Wick Building 24x36x9
Wick Building 24x36x9
Wick Building 24x36x9
Wick Building 24x36x9

Siding and Roofing Finished on South Litchfield Project

Well, it's the beginning of February and the Exterior of the home is close to complete. It took a little bit of patients and a lot of sunshine to melt the snow and sleet off of the felt paper so the Gary and Travis could get the steel panels on the roof. The steel panels were delivered straight from Wick Buildings, LLC. Also the soffit and siding crew siding crew made their trip down last week to install the LP Smartside siding. The weather was perfect for working, but the mud that came along with it was great. Also, Paterson Drywall of New Berlin, Il came to get started.

LP Smartside
Lp Smartside
Brad Neuhaus of Neuhaus Heating and Air

New Home Underway In South Litchfield

This single story home in Litchfield, Illinois is a two bedroom home with a large Country Kitchen that is open to the living room. The home also features a partially finished basement that is very open and has a half bath. The bathroom upstairs is very centrally located in the home and is easy access to the laundry room. The exterior of the home will boast a 6' x 44' front porch and a 8' x 44' rear porch. Both porches are covered and the rear porch will have a 8' x 30' Patriot Sunroom.

Exterior
Exterior
Exterior

Ready for our Family

Pinnacle Point home is ready for their family! Just putting on the finishing touches.

Dining Room
Second Story

New home in Litchfield, IL

This home is just over 2500 sq. ft. Features 3 bedrooms, 2 full bath, office, large great room, kitchen, & dining room with vaulted ceilings. Full basement and a 3 car garage.

Litchfield Home
Litchfield Home
Litchfield Home

Ready for trim and doors

We are now ready for cabinets, trim and doors on this project. Patterson Drywall has finished all of the drywall in the home and Gary and Travis have gotten everything painted. Dan Fox of Fox Flooring has finished all of the hard wood floors and are starting on some of the tile work. Friday we took delivery of all cabinetry from Wills Milling. Today we are going to receive some of the moldings and doors.

Master Bedroom
Top Level from Stairs
Bedroom
Garage